检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆大学机械工程学院新疆,乌鲁木齐830008 [2]新疆特变集团变压器厂,昌吉831100
出 处:《机械设计与制造》2012年第8期81-83,共3页Machinery Design & Manufacture
基 金:国家自然科学基金资助项目(51065028);新疆维吾尔自治区自然科学基金资助项目(2010211A11);中国博士后科学基金资助项目(20090451428);新疆区域物流网络鲁棒性研究(201104701)
摘 要:变压器企业属于单件小批量离散制造业,产品多为定制产品,订单随机性强、不确定因素较多。产品在管理过程中存在产品设计信息的统一和共享困难,项目计划进度无法实现过程控制,无法快速准确的调整计划,在生产制造阶段,经常出现插单,生产计划时常变更,管理人员制订生产计划主观性强,车间计划执行有资源冲突现象。因此,产品研发设计过程和经营管理过程中要适时动态管理,以此提高过程管理的适应性。将项目管理、工作流与生产计划调度结合,提出了基于变压器产品的动态过程管理系统体系架构,并结合变压器企业具体应用,采用JAVA语言和JSP技术开发了动态过程管理系统,增强了企业过程管理的灵活性、准确性。Transformer enterprise belongs to single small batch discrete manufacturing industry,which products are mainly custom ones with strong in orders randomicity and more in unsure factors.While unity and sharing difficulties exist in the management process so that the design schedule is unable to realize process control,and the plan cannot be adjusted fast and accurately.Meanwhile in the manufacturing stage;inserting orders often occur,production plans often change,management personnel often develop a production plan subjectively and the implementation of workshop plan exist the phenomenon of resource conflicts.Therefore,in order to improve the adaptability of the process management,the design process of products process and management process need dynamic management duly.Combined project management,workflow with production planning,and proposed the product management system architecture based on the transformer products.In addition combined with concrete application of the transformer enterprises,dynamic process management adopting JAVA language and JSP technology was developed,which enhanced the flexibility and accuracy for enterprises' process management.
分 类 号:TH16[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15