检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯涛
机构地区:河南省水利勘测设计研究有限公司,河南郑州450016
出 处:《人民黄河》2012年第8期131-133,共3页Yellow River
摘 要:根据金沟河涡管排沙工程的布置形式及排沙要求,提出了排沙涡管开口宽度、涡管直径、涡管与渠道轴线夹角、涡管开口长度、涡管纵向坡度等技术指标的确定方法,计算并分析了排沙涡管截沙率及排沙效果。结果表明:通过对排沙涡管进行改进,金沟河排沙平均耗水量占引进水量的4.51%,符合原设计的技术指标。Based on the comparison test of filling grouting in mined out regions, the grouting processing parameters were optimized, and better grou- ting materials, hole pith, grouting pressure and end standards were selected. The grouting treatment effect was evaluated in view of the velocity section of CT elastic wave test assisted with drilling and grouting situation. The results show that with the hole pitch of 18 m ~ 18 m, the cement grout mixed large amount of fly ash whose water-solid ratio is 1 : 1 has great liquidity. If the pressure rises to 1.0 - 1.5 MPa and filling grouting output less than 10 L/min and lasting 10 min, the filling grouting can stop. The treatment can meet the expected filling effect through comprehensive judgment.
分 类 号:TV68[水利工程—水利水电工程] TV543
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.175.173