检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]School of Resources and Safety Engineering,Central South University [2]Department of Safety and Environment Engineering,Hunan Institute of Technology [3]School of Energy and Safety Engineering,Hunan University of Science and Technology
出 处:《Journal of Central South University》2012年第9期2598-2603,共6页中南大学学报(英文版)
基 金:Project(2011AA060407) supported by the National High Technology Research and Development Program of China;Project(51074073) supported by the National Natural Science Foundation of China
摘 要:The circle geometric constraint model (CGCM) was put forward for resolving the open-pit mine ore-matching problems (OMOMP). By adopting the approaches of graph theory, block model of blasted piles was abstracted into a set of nodes and directed edges, which were connected together with other nodes in the range of circle constraints, to describe the mining sequence. Also, the constructing method of CGCM was introduced in detail. The algorithm of CGCM has been realized in the DIM1NE system, and applied to a short-term (5 d) program calculation for ore-matching of a cement limestone mine in Hebei Province, China. The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles. This model, which is applicable for resolving OMOMP under complicated geometric constraints with accurate results, provides effective ways to solve the problems of open-pit ore-matching.The circle geometric constraint model(CGCM) was put forward for resolving the open-pit mine ore-matching problems(OMOMP).By adopting the approaches of graph theory,block model of blasted piles was abstracted into a set of nodes and directed edges,which were connected together with other nodes in the range of circle constraints,to describe the mining sequence.Also,the constructing method of CGCM was introduced in detail.The algorithm of CGCM has been realized in the DIMINE system,and applied to a short-term(5d) program calculation for ore-matching of a cement limestone mine in Hebei Province,China.The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles.This model,which is applicable for resolving OMOMP under complicated geometric constraints with accurate results,provides effective ways to solve the problems of open-pit ore-matching.
关 键 词:open-pit mine block model blasted-pile mining optimization linear programming mixed integer programming (MIP)
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112