糯扎渡水电站水库初期蓄水方案研究  被引量:13

Research on Initial Water Storage Scheme of Reservoir in Nuozadu Hydropower Station Project

在线阅读下载全文

作  者:杨子俊[1] 张建华[1] 韩兵[1] 

机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051

出  处:《水力发电》2012年第9期51-54,共4页Water Power

摘  要:糯扎渡水库蓄水历时长。在充分考虑并分析糯扎渡水库初期蓄水期间大坝施工、库区移民等工程形象面貌要求,下游生态、河道航运、城市取水、电站发电等综合利用用水需求,以及已建的小湾、景洪水库的协调运行等的基础上,从尽可能实现糯扎渡水电站首台机组早日投产发电的角度拟定水库的初期蓄水方案。The water storage of reservoir in Nuozhadu Hydropower Station Project will last a long time. By fully considering the requirements on the appearances of dam construction and resettlement engineering in reservoir area during the period of initial water storage, analyzing the water demands of ecology, navigation, municipal and power generation in downstream areas, and taking into account the requirements on coordinate operation of Xiawan Reservoir and Jinghong Reservoir, the initial water storage scheme of Nuozhadu Reservoir is developed to achieve the target of putting the first unit of Nuozhadu Hydropower Station into operation as soon as possible.

关 键 词:初期蓄水 综合利用 水库联合运行 糯扎渡水电站 

分 类 号:TV622[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象