作 者:李存斌[1] 陆龚曙[1] 李鹏[1] 张成松[1]
机构地区:[1]华北电力大学经济与管理学院,北京102206
出 处:《华东电力》2012年第8期1325-1327,共3页East China Electric Power
基 金:国家自然科学基金项目(71071054);华北电力大学"211工程"资助项目(X10012)~~
摘 要:对电网建设项目进度风险进行了识别,继而基于粗糙集理论,利用等价类和分辨矩阵等概念计算进度风险因素的相关系数以及建立分辨矩阵,对多个已完成和在建项目的进度风险关系进行了分析,从而为电网建设项目的进度风险管理提供了有力依据,为风险的传递研究打下基础。From the perspective of construction enterprises, this paper identified the schedule risk of grid construction project; then based on rough set theory, this research calculated the correlation coefficient and formulated discernible matrix of schedule risk factors by using the concept of equivalence class and discernible matrix. Finally, the relation- ship of schedule risks in several projects both completed and in progress was analyzed. This research could provide a strong basis for grid construction project schedule risk management, as well as for the further risk transmission re- search.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117