机构地区:[1]中国水电顾问集团中南勘测设计研究院,湖南长沙410014 [2]汉江水利水电(集团)有限责任公司,湖北丹江口442700
出 处:《人民长江》2012年第16期26-30,共5页Yangtze River
摘 要:潘口水电站位于汉江支流堵河上游河段,工程开发任务以发电、防洪为主,为完全年调节水库。枢纽由面板堆石坝、右岸岸边开敞式溢洪道和泄洪洞、左岸引水发电系统组成。大坝填筑料充分利用溢洪道开挖料以及河床砂砾料,较好地解决了料源开采强度大的问题。泄水建筑物按不同高程采用底部泄洪洞和露天开敞式溢洪道,既可满足施工期下游供水要求,又能满足泄洪安全的要求。详细介绍了工程枢纽布置情况及方案比选过程。The Pankou Hydropower Station with annual regulation reservoir is located on the upstream of Duhe River, a tributa- ry of Harljiang River, mainly for power generation and flood control. The project consists of faced rockfill dam, open spillway, flood discharge tunnel on right bank and water diversion system and power generation on left bank. The filling material mainly comes from the excavation for spillway and the riverbed ( sand and gravel) , which well solves the problem of material excavation intensity. The water discharge structure contains open spillway and flood discharge tunnel according to different elevation to satis- fy the demands of downstream water supply during construction period and flood discharge safety. We present the general layout of the hydro - complex and the process of scheme selection.
关 键 词:枢纽总体布置 面板堆石坝 泄水建筑物 潘口水电站
分 类 号:TV74[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.66