潘口水电站岸边溢洪道体型设计  被引量:2

Shape design of spillway on bank of Pankou Hydropower Station

在线阅读下载全文

作  者:郭卫平[1] 陈连军 张雄[1] 

机构地区:[1]中国水电顾问集团中南勘测设计研究院,湖南长沙410014 [2]汉江水电开发有限责任公司,湖北十堰442200

出  处:《人民长江》2012年第16期36-38,共3页Yangtze River

摘  要:潘口水电站溢洪道具有流量大、水头高,挑流水舌与河道夹角相对较大的特点。溢洪道设计充分利用了有利的地形地质条件,采用直线等宽矩形泄槽,保证了水流流态的相对均匀稳定。结合水工模型试验成果,对潘口电站岸边溢洪道各部位体型进行了优化,使溢洪道在泄流能力、各部位水流流态以及挑流消能效果方面都有了很大的改善,能够更好地满足溢洪道运行安全的要求。The spillway of Pankou Hydropower Station is characterized by large discharge, high water head, large angle be- tween water jet and river channel. The favorable geological conditions are fully utilized in the spillway design. The linear rectan- gular discharge trough is adopted to make sure the flow pattern is relatively stable and even. Combining with the experimental re- sults of hydraulic model, the shape of every part of the spillway is optimized. So, the discharge capacity, flow pattern and trajec- tory energy dissipation are significantly improved to meet the demand of safe operation of the spillway.

关 键 词:溢洪道 体型设计 优化设计 潘口水电站 

分 类 号:TV651.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象