检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电第六工程局有限公司潘口项目部,湖北十堰442200 [2]汉江水电开发有限责任公司,湖北十堰442200
出 处:《人民长江》2012年第16期52-53,58,共3页Yangtze River
摘 要:采用常规排架对潘口水电站导流洞渐变段混凝土进行施工时,存在施工投入大、工序多和难度大的缺点。经过多个方案比较,决定采用改制后的钢模台车进行施工。根据渐变段混凝土和钢模台车结构的特性,介绍了边台模板、顶拱模和门架结构的改制施工。改制后的钢模台车可以一次性浇筑完成渐变段边墙和顶拱混凝土,保证了施工质量、缩短了工期并节约了成本。In the concrete construction of transition section of diversion tunnel at Pankou Hydropower Station, the conventional construction method has disadvantages of large investment, many procedures and great difficulty. Through comparison of several schemes, the reformed steel trolley is applied in the construction. According to characteristics of steel trolley structure and con- crete in transition section, the reformed construction process of side template, roof template and gantry is introduced. The con- crete pouring of side wall and roof in transition section can be done in one time by the reformed steel trolley, which ensures the quality, shorts the construction period and save the cost.
分 类 号:TV431[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117