检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省江都水利工程管理处,江苏扬州225200 [2]江苏省水利建设工程有限公司,江苏扬州225002 [3]江苏省鸿源招标代理有限公司,南京210001
出 处:《水利科技与经济》2012年第9期22-24,共3页Water Conservancy Science and Technology and Economy
摘 要:近年来,南水北调东线一期工程新建泗洪站、金湖站、蔺家坝站等采用了大流量低扬程的卧式贯流泵,其对安全和经济运行性要求高,工况调节方式一直是探讨和研究的重点。通过对南水北调东线已经安装的贯流泵工况调节方式的比选,泗洪泵站选择了变频调节方式。针对泗洪站灯泡贯流泵选用变频方式对工况进行调节可行性进行了分析,认为采用变频方式进行调节是合理的,可供类似泵站建设参考。In recent years, Sihong Station, Lake Station, Linjiaba station in the Eastern of the South - to - Noah Water Transfer Project using a large flow of low - lift of the horizontal tubular pump, safety and economic operation of its high requirements, condition adjustment method has been the focus of discussion and research. South Eastern has been installed on the tubular pump condition adjustment method of comparison, pumping Station Project Sihong selected frequency adjustment method o The article passed through the class pump to the Sihong station light bulb to select the frequency conversion format to carry on the adjustment feasibility to the operating mode to carry on the analysis, thought that used the frequency conversion format to carry on the adjustment is reasonable, might supply the similar pumping station construction reference.
分 类 号:TV528[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15