检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张鹏[1]
机构地区:[1]中国矿业大学(北京)资源与安全工程学院,北京100083
出 处:《煤炭工程》2012年第9期80-83,共4页Coal Engineering
基 金:2011年中央高校基本科研业务费追加奖励资金(研究生科研专项)资助项目(2011YZ09)
摘 要:以黄沙矿2上煤层为工程背景,采用结构力学中的力法对试验工作面的老顶初次垮落进行了力学分析。通过建立老顶—工作面基本力学模型,分析老顶首次破断时的极限弯矩,得出老顶初次垮落步距l的求解方程,计算出老顶初次垮落步距为22.4m,并利用采动裂隙椭抛带理论为瓦斯抽放巷道位置的选择提供预测和理论支持。Base on No. 2up seam of Huangsha Mine as the project background, the force method of the structure mechanics was applied to the mechanics analysis on the initial falling of the main roof in the trial coal mining face. With the establishment of the basic mechanics model of the main roof - coal mining face, the uhimate bending torque was analyzed when the first broken of the main roof occurred. The solution equation of the initial falling interval of the main roof was obtained and the initial falling interval of the main roof was calculated as 22. 4m. The elliptic parabolic zone theory of the mining fractures was applied to provide the prediction and theoretical support to the selection on the location of the gas drainage gateway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117