检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中建八局第三建设有限公司,江苏南京210046
出 处:《施工技术(下半月)》2012年第8期73-76,共4页Construction Technology
基 金:住房和城乡建设部2010年科学技术项目计划(2010-R3-17)
摘 要:针对施工总承包企业研发项目实施过程管理进行研究,具体阐述了施工总承包企业研发项目实施过程的关键环节,如研发项目的计划与协调,研发人员的时间保证措施,研发进度的监控与协调,研发经费的使用与管理,研发质量的检查与考核等。为施工总承包企业研发项目的实施提供参考,从而不断推进施工总承包企业技术创新能力,并提高施工总承包企业的竞争力。Management of the implementation process of R&D projects was studied for construction general contractor. The key steps of the implementation process management are described, which includes the planning and coordination of R&D project, guarantee of time allocation for researchers, monitoring and coordination of development progress, management of R&D funds, the examination of research results, etc. The work performed provides references for implementation of R&D project by construction general contractors, helps their technological advancement and improves their competitiveness continuously.
分 类 号:TU721.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.75