南水北调东线睢宁二站工程总体布置与设计  被引量:4

General Layout Design for Suining Pump Station Ⅱ on the Eastern Route of the South-to-North Water Transfer Project

在线阅读下载全文

作  者:陈亚军 张洋 白莉萍 姜成启 张占[2] 耿亮 郑孝军 蒋云杰 连伟 

机构地区:[1]徐州市水利建筑设计研究院,江苏徐州221000 [2]江苏省骆运水利工程管理处,江苏宿迁223800

出  处:《南水北调与水利科技》2012年第A02期3-4,共2页South-to-North Water Transfers and Water Science & Technology

摘  要:根据南水北调东浅睢宁二站场地自然条件,结合施工、运行管理等方面进行综合设计,使得泵站中各建筑物布置紧凑、合理。从设计角度,对主泵站、上下游引河、基坑支护、清污机桥及附属桥梁等方面全面阐述了泵站工程总体布置设计。The yard's natural conditions, construction,operation and management and other aspects are considered in the design of the Suining pump station Ⅱ. The buildings are arranged compactly and reasonably. From the angle of design, the general layout design of pump station, including the main pumping station, downstream approach channel, foundation pit, bridge of clean-feeulance machine and ancillary bridge are elaborated in the round by the author.

关 键 词:南水北调 泵站 总体布置 设计 

分 类 号:TU68[建筑科学—建筑技术科学] TV992.25[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象