检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周杰彬[1,2] 刘长武[1,2] 李晓迪[1,2] 徐煜航[1,2]
机构地区:[1]水力学与山区河流开发保护国家重点实验室 [2]四川大学水利水电学院
出 处:《金属矿山》2012年第8期44-47,60,共5页Metal Mine
基 金:国家自然科学基金项目(编号:50879049;50574064);国家重点基础研究发展计划(973计划)项目(编号:2010CB226802)
摘 要:结合传统长壁垮落法和充填开采法的优点,根据邢东矿1221工作面具体开采条件,提出利用极不充分开采原理与冒落带注浆结合来控制地表下沉,为建筑物下开采提供了理论和技术支持。同时,对该方法的采充顺序和减沉效果做了进一步分析,结果表明:该方法减沉效果明显,下沉率会小于0.2。Combining with the advantages of the traditional long wall caving method and conventional filling technology method,according to the specific mining condition of 1221 mining face of Xingdong mine,super-subcritial extraction and cave backfill grouting combined is proposed to control the surface subsidence.It provides theory and technology support for mining under building.Meanwhile,the mining sequence and effect of reducing subsidence were analysis.Results show that effect of reducing subsidence is obvious by using this method,and the sink rate is smaller than 0.2.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222