检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《浙江理工大学学报(自然科学版)》2012年第5期709-713,共5页Journal of Zhejiang Sci-Tech University(Natural Sciences)
基 金:国家自然科学基金项目(11001242;11071220);浙江省自然科学基金项目(Y6090554;Y6090175;Y6110091)
摘 要:主要研究一类三阶段供应链排序问题。储存工件的仓库和工厂在不同的地点,工件加工前需要从仓库运到工厂,加工完后再运回仓库。文中分别考虑了两个模型,第一个是两辆有容量限制的同类型车和单台机;第二个是一辆车和两台平行机。目标函数是极小化最后一个工件运回仓库的时间。针对两个模型,提出了相应的近似算法并证明其最坏情况界分别为2和2+1/2λ-1(其中λ>1)。In this paper, we study a three-stage supply chain scheduling problem. The warehouse that stores all materials and finished jobs, as well as the machines that process the jobs are located at different places. The jobs travel between the factory and warehouse. The paper mainly considers two models: one involves two vehicles and a single machine; the other involves a vehicle and two parallel machines. The ob- jective is to minimize the makespan of the schedule, i. e. , the period within which all jobs are transported back to the warehouse after processing. For both models, we present algorithms and show that their worst-case ratios are 2 and 2+2λ-1^-1(λ〉1),respectively.
分 类 号:O233[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117