检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁学群[1]
出 处:《石油化工设计》2012年第3期4-6,10,共4页Petrochemical Design
摘 要:在石油化工装置中大型用电机组起动方案的确定直接关系到整个装置的供电系统设计,如何确定大型电动机组的起动控制方案,既满足上级电源电网的技术要求,同时又具备优良的技术性价比和良好经济效益与社会效益,是一个值得研究的课题。现根据企业电源电网系统的实际情况以及超大型电动机组的技术参数,从建模计算到起动控制方案的分析研究及确定,进行了详细的论述,对超大型电动机组起动方案的确定有一定的指导意义。In petrochemical plants,the starting scheme of large motor directly influences the design of power supply system for the plant.How to determine the starting and control scheme of large motor so as to not only satisfy the technical requirements of superior power grid,but also achieve excellent cost performance and good economic and social benefit is a topic which is worth studying.According to the actual conditions of power grid of petrochemical plants and the technical data of extra-large motor,this paper discusses in detail the starting and control scheme of large motor from modeling calculation to research and determination.It can be used to guide the determination of starting and control scheme for large motor.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38