检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东科技大学,山东青岛266590 [2]烟台金邦冶金工程咨询有限公司,山东烟台264000
出 处:《隧道建设》2012年第4期502-505,517,共5页Tunnel Construction
基 金:国家自然科学基金资助项目(10672091);山东省高等学校科技计划资助项目(J08LA07)
摘 要:针对胶州湾海底隧道青岛端接线工程匝道开挖对主隧道的振动影响,在主隧道内进行爆破振动监测。以实测振速数据为依据,分析主隧道内对应匝道工作面前后震动波的传播规律,得到垂直振速、水平径向振速以及水平切向振速随测点距工作面距离不同的变化规律。分析发现,主隧道内已开挖区爆破振速大于未开挖区振速,未开挖区振速在一定范围内相对稳定。In order to study the Vibration influence on Jiaozhou Bay Sub-sea Tunnel induced by the blasting in the ramp tunnel, blasting vibration monitoring is made in the main tunnel. The propagation rules of vibration waves in the main tunnel are analyzed on basis of the measured vibration data. The propagation rules of the vibration velocity are obtained. The analysis shows that the b unexcavated section and that lasting vibration velocity in the excavated section of the main tunnel is larger than that in the vibration velocity in the unexcavated section is stable in certain range.
分 类 号:U455.6[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249