检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东电力设计院,上海市200063
出 处:《电力建设》2012年第9期46-50,共5页Electric Power Construction
基 金:国家工程项目(发改能源[2009]966号)
摘 要:国电谏壁发电厂2×1000 MW机组在工程设计中采用了低碳设计。从系统设计和主机设备选型、优化设计、节能设计和为电厂运行中节能管理创造条件等方面对工程低碳设计进行了论述,较全面地展示了低碳设计的特点。谏壁发电厂工程低碳设计成果显著,其经验可供同类电厂工程参考。Low carbon design schemes had been adopted for Guodian Jianbi Power Plant project (2 x 1 000 MW units). This paper proposed the calculation formula of low carbon design for condensing units, and analyzed the low carbon design for the project from four aspects: system design and main equipment selection, optimization design, energy saving design and design requirements of energy-saving management during operation. In addition, the major features of low carbon design were also introduced comprehensively. The low carbon design for Guodian Jianbi Power Plant has remarkable achievements, whose experience can be a reference for similar power plants.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222