火电机组辅控一体化集中监控网络方案及配置  被引量:6

Network Plan and Assignment of Integrative Centralized Control of Auxiliary Control in Heat-Engine Units

在线阅读下载全文

作  者:杨金芳[1] 张玉柱[1] 徐同社[1] 

机构地区:[1]河北省电力勘测设计研究院,河北石家庄050031

出  处:《电力勘测设计》2012年第4期33-37,共5页Electric Power Survey & Design

摘  要:本文以中电投集团石家庄良村2×300MW热电工程辅助车间控制网络(辅控网)的组建为例,介绍了大型火力发电机组如何通过组建辅控网,实现对众多的辅助车间系统实施实时、有效、统一的监控。重点论述辅控网网络设计原则、网络拓扑结构及各辅控系统硬件配置,同时给出在设计及实施过程中应着重的注意事项。It is introduced in this paper the way to construct a BOP control network in a large scale fossil fuel power plant to control and monitor various BOP shops real-timely, effectively and unifbrmly based on the erection process of the BOP control network of Liangcun 2 × 300MW thermal power plant project in Shijiazhuang of Zhongdiantou group. The BOP control network design principal network structure, and hardware configuration are discussed thoroughly as well as fous questions in design and erection.

关 键 词:辅控系统 辅控网 PLC 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象