峡江水利枢纽泄水闸底板裂缝成因有限元分析  被引量:1

Analysis of causes of cracks in sluice bottom of Xiajiang Hydro-junction based on finite element method

在线阅读下载全文

作  者:万迪文 

机构地区:[1]峡江水利枢纽工程管理局,江西南昌330046

出  处:《南昌工程学院学报》2012年第4期54-56,61,共4页Journal of Nanchang Institute of Technology

摘  要:结合施工期大坝安全监测所得应力、温度等实测数据,运用非线性有限元法对泄水闸底板进行施工期仿真计算.通过对仿真计算结果与裂缝实际分布的对比分析,得出裂缝形成的主要成因是基础约束、温度应力,并提出了防治裂缝的针对性措施.In order to analyze the different causes of various cracks in Xiajiang Hydro-junction, the sluice bottom is simulated with the nonlinear finite element method (FEM), combining the stress and tempera- ture experimental data obtained from the dam safety monitoring process. Through the comparison and anal- ysis of actual conditions and the results with the actual distribution of cracks,it is concluded that the pri- mary factors causing different kinds of cracks are infrastructure constraints and temperature stress. The pa- per proposed some specific measures of prevention and treatment of cracks.

关 键 词:底板裂缝 安全监测 实测数据 非线性有限元 裂缝成因 

分 类 号:TV315[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象