检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘军进 徐自国[1] 徐强[1] 刘枫[1] 段向胜[1] 陆道渊[2] 黄良[2] 徐麟[2] 葛冬云
机构地区:[1]中国建筑科学研究院,北京100013 [2]华东建筑设计研究院有限公司,上海200002 [3]中建一局集团建设发展公司,北京100102
出 处:《建筑结构》2012年第9期137-141,共5页Building Structure
基 金:国家科技支撑计划资助(2006BAJ01B04)
摘 要:重力荷载下,75层的天津津塔超高层建筑竖向构件会出现较明显的压缩变形以及相互之间的差异压缩变形。通过施工过程结构分析及预变形技术,确定出构件加工预调值和施工安装预调值,使得建造完成后的结构实际位形能符合预期目标位形。为提高精度,分析时计入了地基不均匀沉降、混凝土收缩徐变对施工模拟和预变形值的影响。Under the gravity load, the vertical members of Jin Tower (75 stories) in Tianjin would have notable compression deformation and difference of compression deformation. To achieve the designing objective shape, the construction process analysis and pre-deformation technique were used to get the preliminary adjustment value of the member size and the erection coordinate. To improve the calculation precision, the differential settlement of the foundation and the shrinkage and creep of concrete were taken into consideration.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.187