冒落带高度探测方法研究  被引量:2

Study on Detection Method of Caving Zone Height

在线阅读下载全文

作  者:张羽 王晓蕾[2] 孙晓艳[2] 

机构地区:[1]山西潞安环保能源股份公司余吾煤业公司,山西长治046032 [2]河南理工大学,河南焦作454000

出  处:《中州煤炭》2012年第8期4-6,9,共4页Zhongzhou Coal

摘  要:利用全景摄像系统,通过井下分段注水试验,探测开采余吾煤业工作面冒落带高度情况,并利用相似模拟和数值模拟对冒落带高度发育情况进行了模拟。研究结果表明:上覆岩层冒落带的高度在28.6~31.0m,对所有结果综合进行拟合,得其拟合曲线为:y=-0.085 88x2+5.82x±6.1。The segmented panoramic camera system and underground injection test were used to detect the height of caving zone on working face of Yuwu Coal Industry Co. ,analog simulation and numerical simulation were also used to simulate the development of ca- ving zone. Results show that : the height of overburden caving zone is between 28.6 - 31.0 m,and the complete fitting was made based on the data obtained,then the fitting curve was drawn,that is :y = - 0. 085 88x2 + 5.82x =l: 6.1.

关 键 词:冒落带高度 注水试验 拟合曲线 数值模拟 相似模拟 

分 类 号:TD325[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象