检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广西壮族自治区交通规划勘察设计研究院,广西南宁530029
出 处:《西部交通科技》2012年第8期64-67,共4页Western China Communications Science & Technology
摘 要:文章以某预应力混凝土拱塔斜拉桥为研究对象,通过建立全桥空间有限元模型,利用弯曲能量最小法、影响矩阵法、综合法以及正装迭代改进法对该桥成桥使用阶段和施工阶段的拉索索力进行了优化计算分析。结果表明,采用综合法和正装迭代改进法能有效确定桥梁成桥使用阶段和施工阶段的合理拉索索力。Taking an arch tower cable-stayed bridge in pre-stressed concrete as a research object,through establishing spatial finite element of the whole bridge,using minimum bend- ing energy method, influence matrix method, comprehensive method and forward iteration improvement method,the article made optimization calculation analysis of the cable force at the stages of application and construction.It is proved that with comprehensive method and forward iteration improvement method,the reasonable cable force of the bridge at the stag- es of application and construction.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40