检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学电气与新能源学院,湖北宜昌443002 [2]湖北黄龙滩水力发电厂,湖北十堰442005
出 处:《水电能源科学》2012年第9期122-124,216,共4页Water Resources and Power
基 金:湖北省自然科学基金资助项目(50579019);湖北省教育厅自然科学研究基金资助项目(Q20091307)
摘 要:水轮机在实际运行中存在振动区,水电机组需避免在此区间运行。为此建立了考虑水轮机振动区的水电机组组合优化的发电量最大数学模型,利用分支定界法确定了机组的运行区间,并采用动态规划方法求最优解。实例应用结果表明,分支定界与动态规划相结合的方法适合于水电机组的实际运行情况,且提高了求解精度。Hydro turbines may be running in the vibration zone, so hydropower units are forbidden to run in this zone. The mathematical model of hydropower unit commitment with maximum electricity is established by considering vibration zone. The branch and bound method is used to determine operating range of generating set and the optimal solution are obtained by using dynamic programming. The example results show that the proposed method is fitted for solving hydropower unit commitment and improves the solution precision.
分 类 号:TV734[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117