检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林涛[1] 孙永涛[1] 孙玉豹[1] 张伟[1] 张卫行[1]
机构地区:[1]中海油田服务股份有限公司油田生产研究院,天津300450
出 处:《石油化工应用》2012年第8期10-12,共3页Petrochemical Industry Application
基 金:国家科技重大专项"大型油气田及煤层气开发-海上稠油高效开发新技术(二期)(编号: 2011ZX05024-005-001)"经费资助
摘 要:海上油田热采受作业环境及工艺要求影响,常规的杆式泵注采一体化管柱在海上不适用,提出注热与电潜泵机采管柱来解决现场开发问题。通过对热采专用三通的设计,组配耐温 260 ℃的高温电潜泵,热采期间下入一趟管柱,可满足热采作业和后续生产的要求,简化现场施工工艺,提高作业时效。该管柱已在渤海稠油油田热采中成功应用,为保证热采工艺实施提供了技术支持,也为后续注采工艺的发展探索了新道路。Thermal recovery on offshore oilfield was affected by operation environment and technological requirements, and conventional pipe string of inserted barrel pump with func- tion of heat injection and artificial lift was not applicable for offshore oilfield. It was pro- posed that integration pipe string with function of heat injection and ESP artificial lift to solve the problem. It can meet demand of both thermal operation and subsequent productive through design of thermal special T-joint and 260 ℃ temperature tolerance high temperature ESP. During thermal operation only once pipe string was tripped in, and in-situ implement technology was simplified. It raised operation prescription. It was successfully applied on Bohai Bay oilfield, and it guaranteed thermal technology implementation as technical sup- port. The integration pipe string with function of heat injection and artificial lift will explore one new way for subsequent injection/production technology development.
分 类 号:TE933.3[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33