检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中海石油(中国)有限公司湛江分公司,广东湛江524057 [2]斯伦贝谢中国海洋服务公司,广东深圳518068
出 处:《石油钻探技术》2012年第4期81-85,共5页Petroleum Drilling Techniques
摘 要:南海莺歌海盆地某气田A15井是一口典型的高温低压定向深井,井底温度高、地层压力低、尾管固井环空间隙小,若采用常规尾管固井技术固井顶替效率低,易发生气窜和漏失,高温低压气层井段的封固质量难以保证。为提高该井尾管固井的质量,该井采用了旋转尾管固井技术和高温胶乳防气窜水泥浆体系,与优选出的油基钻井液冲洗液和隔离液配合,通过预测旋转扭矩和尾管的居中度,完成了该井高温低压储层段177.8mm尾管固井作业。高清扇区水泥胶结测井结果证实,该井尾管固井井段气水隔层和射孔井段封固质量达到良好,高压水层封固质量合格,与采用常规固井技术的邻井A9井相比,尾管固井质量大幅提高。A15井旋转尾管固井的成功,为南海莺歌海盆地高温低压定向井尾管固井质量的提高提供了一条新途径。A deep directional Well A15 with typical high temperature and low pressure in Yinggehai Basin of South China Sea has small annular clearance in liner cementing. Using conventional liner cementing method in the well could have such difficulties as poor displacement efficiency, gas channeling, lost circulation, such that good liner cementing quality would hardly be guaranteed. In order to improve the liner cementing quality,rotating liner cementing and high temperature anti-gas channeling cement slurry were used, together with oil based flushing fluid and spacer. By rotating torque and liner centering degree simulation,the 4177.8 mm liner cementing job in this high temperature and low pressure reservoir has been successfully completed. Sector Bond Tool(SBT)logging proved that Well A15 is highly improved in cement slurry displacement efficiency; with satisfactory cementing quality at gas-water interlayer and perforation intervals, qualified seal of high pressure water layers compared with offset wells cemented by conventional liner cementing method. The successful application of rotating liner cementing has offered a new solution for HTLP deep directional wells in gas field in Yinggehai Basin.
关 键 词:尾管固井 高温 低压 旋转尾管 水泥浆 水泥胶结测井 莺歌海盆地
分 类 号:TE256.4[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145