检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘兴文[1]
机构地区:[1]西安铁路职业技术学院土木工程系,西安710600
出 处:《高速铁路技术》2012年第4期87-90,共4页High Speed Railway Technology
摘 要:以某桥预应力混凝土连续箱梁体系转换的设计与施工为工程背景,介绍了在桥梁最大设计跨度小于80m,桥墩高度小于12m的施工条件下,0号块临时固结结构设计、合龙方式选择、体系转换施工准备、临时固结结构的固结与解除等施工技术。施工实践表明,应用该项技术进行预应力混凝土连续箱梁施工,箱梁的结构内力、线形及梁体外形尺寸偏差等均符合设计文件、施工技术指南和质量验收标准要求,实现了绿色施工的工程管理目标。Taking the design and construction of the system conversion of a certain bridge with prestressed concrete continuous box beam as engineering background, this paper introduces the design for temporary consolidation structure of # 0 block, closure mode selection, preparation for system conversion, consolidation and removing skill for temporary con solidation structure under the condition of building a bridge with the max. span less than 80 m while pier height less than 12 m in design. Construction practice indicates the inner force, line shape and overall dimension difference of the box body meet the requirement of design document, technical manual and quality acceptance standard in the construction of prestressed concrete continuous box beam by using this technology, thus to achieve the engineering management aim of green construction.
分 类 号:U445.466[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28