检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水电水利规划设计总院,北京100120 [2]国网新源建设有限公司,北京100053
出 处:《水力发电》2012年第10期43-46,共4页Water Power
摘 要:我国大坝建设蓬勃发展,许多世界级的超高坝已经或即将在西部高地震烈度区域建设。通过对典型工程震害案例进行分析表明,在避开主要地质缺陷、合理设计、认真施工的基础上,混凝土坝具有较强的抗震性能。但在水电工程抗震研究、设计中,混凝土材料动态特性、坝体与无限地基动力相互作用、坝体与库水动力相互作用、坝体横缝动接触等问题仍需要进一步深入研究,相应的设计规范也有待进一步修正。Many world-class extra-high dams have been or will be constructed in western mountainous area of China where the seismic intensity is high. The analyses on typical earthquake damage cases show that the concrete dam has good earthquake- resistant performance after avoiding major geological defects, reasonable design and careful construction. But in the seismic study and design of concrete dam, some problems, including the concrete material dynamic characteristic, the dynamic interaction between dam and infinite foundation, the interaction between the dam and reservoir water and the dynamic contact of transverse joints, still need further study, and the corresponding design specification needs to be further revised.
分 类 号:TV222[水利工程—水工结构工程] TU352.11[建筑科学—结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.207