双悬挑屋盖结构双塔机退吊施工工艺  

The Constructional Method of Removal of Dual Tower Crane in the Construction of Two direction Overhanging Roof Structure

在线阅读下载全文

作  者:鲍广鑑 王煦 

机构地区:[1]深圳建升和钢结构建筑安装工程有限公司,广东深圳518005

出  处:《施工技术》2000年第8期12-14,共3页Construction Technology

摘  要:厦门国际会展中心主体屋盖为双向大悬臂空间桁架结构 ,其中 35m跨悬挑桁架采用地面分段拼装、空中无支撑接装组拼、塔机分榀顺次退吊工艺 ,确保了结构的整体稳定、受力合理 ,减少施工投入 。The roof of the main building of Xiamen International Meeting and Exhibition Center adopted the two\|direction large overhanging spatial bar\|frame structure. Its overhanging bar\|frame, whose span is 35m, was divided into several sections and assembled separately on the ground, and finally was integrated in the air without any supports. The removal of tower cranes was used the sequential piece\|by\|piece method to ensure higher whole stabilization of structure, more proper stress distribution, lower constructional input, and quicker progress.

关 键 词:屋盖结构 钢结构 空间桁架 悬臂桁架 安装工程 

分 类 号:TU758.11[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象