检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴琼[1]
机构地区:[1]煤炭科学研究总院沈阳研究院,辽宁沈阳110016
出 处:《中州煤炭》2012年第9期97-99,共3页Zhongzhou Coal
摘 要:煤层的透气性是影响瓦斯抽放效果的主要因素之一,布置交叉钻孔进行抽放能有效增大煤层的透气性。为使交叉钻孔既能提高煤层的抽放效果,又能尽量缩短工期,对试验区域交叉钻孔的孔间距及预抽时间进行了研究。在同一试验区域中布置了4组不同间距的交叉钻孔,考察了各组钻孔瓦斯预抽效果随时间变化的情况,得出了不同间距下瓦斯预抽率与时间的关系,确定了合理的瓦斯预抽钻孔间距及预抽时间。The permeability of the coal seam is a main factor which influences the effect of gas drainage, reasonable arrangement of crossed boreholes can effectively increase the permeability of the coal seam. To ensure the crossed boreholes both to improve the drain- age effect of the coal seam, and to shorten the construction period, the crossed boreholes spaces and pre-drainage time were studied in the test areas,crossed boreholes with four different spaces were arranged in the same test area,the relationship between the time and gas pre-drainage effect was also investigated for each group of the boreholes. The relationship between pre-drainage rate with different spaces and the time was obtained,the reasonable borehole spaces and pre-drainage time were determined,too.
分 类 号:TD712.6[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117