作 者:刘辉
机构地区:[1]中国水利水电第十六工程局有限公司,福建福州350003
出 处:《水利水电技术》2012年第9期69-73,共5页Water Resources and Hydropower Engineering
摘 要:新疆布尔津山口水利枢纽坝址区两岸地形陡峭,工程地质条件比较复杂,节理裂隙发育,边坡稳定性差,边坡开挖高差大,且同时紧临与引水系统和厂房标施工工作面,交叉作业问题突出。施工中采用了自上而下分台阶开挖,边坡加固以锚筋桩、预应力锚索为主,喷锚等施工技术,确保了开挖边坡稳定和施工安全。As the topographies of both the banks of the site for Shankou Water Control Project in Bu' erjin of Xinjiang are quite precipitous with a complicated geological condition of developed joint fissures and poor slope stability, the height difference of the excavations of both the slopes are large, while the excavations are close to the working faces of the constructions of the water delivery system and the powerhouse with protrudent problems from the corssing operations of construction. During the construction the technologies of top-down excavation in steps, slope strengthening mainly with anchor-bar piles, prestressed anchor cable as well as well shotcrete rockbolt, etc. are adopted, and then the stabilities of the excavating slopes and the construction safety are ensured.
关 键 词:拱坝 高边坡 施工技术 开挖支护 山口水利枢纽 新疆
分 类 号:TV542[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31