三峡右岸水电站700MW级巨型全空冷水轮发电机结构与安装  

Structure and Installation of 700MW Giant Air-to-Water Cooled Hydroturbine Generator in Hydropower Station of Three Gorges Right Bank

在线阅读下载全文

作  者:朱洪雷[1] 

机构地区:[1]哈尔滨电机厂有限责任公司,黑龙江哈尔滨150040

出  处:《防爆电机》2012年第5期32-34,共3页Explosion-proof Electric Machine

摘  要:主要介绍了三峡右岸电站机组的总体设计结构及在定子、转子、推力及上下导轴承、上下机架等主要分装配安装方面的一些主要特点与工艺。四台机组先后投产发电,实现了一台比一台好的既定目标,各项指标创造了三峡电站国家精品工程。对民族工业的振兴,起到了不可忽视的重要作用。This paper mainly introduces the overall design structure of hydropower station units stationed on right bank of Three Gorges. Some key installation features and technologies of its stator, rotor, thrust bearing, upper and lower guide bearings, and upper and lower body frames are also described. The four units have suecessively put into production and generated e- lectricity. They have achieved the established goal, i.e. the latter motor is better than the pre- vious motor. All indicators have achieved the level of national quality project. They have played a essential role in the revitalization of national industry.

关 键 词:水轮发电机 定子 转子 轴承 机架 

分 类 号:TM312.1[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象