检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]成都理工大学,四川成都610059 [2]中国地质科学院探矿工艺研究所,四川成都611734 [3]北京探矿工程研究所,北京100083
出 处:《探矿工程(岩土钻掘工程)》2012年第9期49-52,65,共5页Exploration Engineering:Rock & Soil Drilling and Tunneling
基 金:科技部科技支撑计划专项"汶川地震断裂带科学钻探(WFSD)"项目之"科学钻探与科学测井"课题
摘 要:汶川地震断裂带科学钻探工程的地层条件十分复杂,岩层破碎,膨胀缩径,不确定因素多,出现多次卡、断、落等孔内事故,但都科学诊断、成功处理。通过优化钻进方法、钻具结构及泥浆体系等多种事故预防措施,最大限度地减少事故发生,保证了科学钻探工程的顺利进行。The formation conditions of Wenchuan earthquake fault scientific drilling project are very complicated. Broken rock formation, lost circulation and borehole shrinkage are encountered frequently. As a result, many drilling accidents, such as drill pipe sticking, drilling pipe breaking, objects dropping and so on happened and were successfully solved. Technical measures for preventing accidents, including scientific diagnosis and optimizing drilling method, drill tool structure and drilling mud system, have been taken to minimize accidents and ensure the smooth progress of scientific drilling project.
关 键 词:汶川地震 地震断裂带 科学钻探 事故预防 事故处理
分 类 号:P634.8[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7