检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海船舶运输科学研究所军品分所,上海200135
出 处:《上海船舶运输科学研究所学报》2012年第2期65-68,73,共5页Journal of Shanghai Ship and Shipping Research Institute
摘 要:为提高中频电站监控装置调试的效率,降低调试运行成本,为中频电站监控装置出厂检验提供依据。设计了基于ARM重复中断定时器(Repetitive Interrupt Timer,RIT)的中频发电机组电气输出信号模拟装置,替代实际发电机组产生的交流电信号。该模拟装置通过ARM的通用输入输出口(General Purpose Input/Output,GPIO)输出400Hz的方波,再将方波转换成正弦波,用来精确模拟中频发电机组产生的电压、电流间的相位关系及波形。The signal generator which replaces the medium frequency generator is developed to improve the efficiency, hence, reduce the costs of the test and adjustment of the medium-frequency power plant monitoring products. The signal generator u-ses repetitive interrupt timer of ARM processor to control the work flow and output a 400 Hz square wave via GPIO of the ARM processor. The square wave signal is transformed into sine wave afterwards. The final output can simulate the waveform and the phase relationship between the voltage and the current of real generator output.
分 类 号:TP273[自动化与计算机技术—检测技术与自动化装置]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.66