检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Zhuo-fu WANG Ji-yong DING Gao-sheng YANG
机构地区:[1]Institute of Engineering Management, Hohai University, Nanjing 211100, P. R. China
出 处:《Water Science and Engineering》2012年第3期340-349,共10页水科学与水工程(英文版)
基 金:supported by the Special Fund for Public Welfare Industry of the Ministry of Water Resources of China (Grant No. 201001007)
摘 要:Levees are affected by over-exploitation of river sand and river adjustments after the formation of sand pits. The slope stability is seriously threatened, drawing wide concern among experts and scholars in the area of water conservancy. This study analyzed the uncertainties of slope stability of levees under river sand mining conditions, including uncertainty caused by interest- driven over-exploitation by sand mining contractors, and uncertainty of the distance from the slope or sand pit to the bottom of the levee under the action of cross-flow force after the sand pit forms. Based on the results of uncertainty analysis, the distribution and related parameters of these uncertainties were estimated according to the Yangtze River sand mining practice. A risk model of the slope instability of a levee under river sand mining conditions was built, and the possibility of slope instability under different slope gradients in a certain reach of the Yangtze River was calculated with the Monte Carlo method and probability combination method. The results indicated that the probability of instability risk rose from 2.38% to 4.74% as the pits came into being.
关 键 词:sand mining " levee risk analysis " slope instability " Monte Carlo method " probabilitycombination method
分 类 号:TV85[水利工程—水利水电工程] P642.22[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31