检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]深圳市交通公用设施建设中心,广东深圳518040
出 处:《城市道桥与防洪》2012年第9期242-246,341,共5页Urban Roads Bridges & Flood Control
摘 要:该文以深圳某公路隧道为工程背景,采用有限元程序对该连拱隧道的施工过程进行了数值模拟,得到了隧道围岩的变形规律、应力分布特征,以及围岩位移随时间变化的规律。采用荷载-结构法对隧道二次衬砌内力和截面配筋进行了验算。验算结果表明:设计时可通过增大局部截面厚度和增加钢筋来提高衬砌结构强度,从而最大程度地保证隧道施工的安全进行。With the engineering background of a highway tunnel in Shenzhen,the finite element program is used to numerically simulate the construction process of multi-arch tunnel,and achieves the deforming rule and stress distribution characteristic of tunnel surrounding rock,and the rule of surrounding rock displacement with the time change.The load-structure method is used to check the secondary lining inner force and the sectional reinforcement of tunnel.The checking result shows that the strength of lining structure can be upgraded by increasing the local sectional thickness and the reinforcing bars so as to guarantee the safe construction of tunnel at the maximum extent.
分 类 号:U456.343[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.194