正面吊作用下混凝土板规范计算厚度过大的原因探讨  被引量:1

Reasons of excessive thickness of concrete slab calculated from standard in the container yard pavement under action of reach stacker

在线阅读下载全文

作  者:牛晓丹[1] 胡鹏[1] 

机构地区:[1]中交水运规划设计院有限公司,北京100007

出  处:《水运工程》2012年第9期200-202,共3页Port & Waterway Engineering

摘  要:大连港大窑湾港区6#和7#泊位集装箱堆场箱角间混凝土板厚按规范计算需40 cm,实际工程仅为20 cm。原设计不允许正面吊作业,实际正面吊进行了相当长时间作业后,混凝土板并未破坏。对铺面设计进行计算比较认为:混凝土板规范计算厚度过大的原因是刚性铺面下采用的土基回弹模量过小。According to the standard when calculating the thickness of the concrete slab, the value is 400mm in the container yard in berth No. 6 & berth No.7 of Dayaowan port area of Dalian port. But in the practical project, it was only 200 mm. The reach stacker was not allowed to work here by the original design. However, the concrete slab was not damaged after a lengthy operation of the reach stacker virtually. Different pavement designs were compared by calculations and the conclusion was that the reason why the thickness of slab was overlarge was that the modulus of resilience of earth subgrade adopted under the rigid pavement was too small.

关 键 词:正面吊 混凝土板 回弹模量 计算厚度 

分 类 号:U655[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象