伊犁试验路温度、时间及路基深度关系分析  被引量:1

Analysis of Relationship between Tempreature,Time and Roadbed Depth in Ili

在线阅读下载全文

作  者:仲小玲[1] 刘红春[1] 刘尊青[1] 

机构地区:[1]新疆农业大学,乌鲁木齐830000

出  处:《现代交通技术》2012年第4期1-3,共3页Modern Transportation Technology

基  金:西部交通建设科技项目(200631879736)

摘  要:基于ORIGN软件对新疆伊犁试验路采集的温度数据进行分析,研究温度与时间、路基深度的关系。结果表明:高斯公式可作为伊犁地区月平均温度与时间的数学模型;通过温度与地基深度关系数据分析可得,随着土壤深度的增加,地温最高值或最低值出现的时间逐渐延迟。高温季节温度随深度的增加线性递减,低温季节温度随深度的增加线性递增,可采用直线式作为该地区温度与路基深度的数学模型。Based on the ORIGN software's analysis of the temperature data collected in the Xinjiang Yili test road,this paper studies the relationship between temperature, time and roadbed depth. The result shows that gauss formula can be used to establish mathematical model of monthly mean temperature and time in Ili. According to the temperature and soil depth data, it is concluded that with the increase of soil depth, the maximum and minimum temperature delay to appear. During the high-temperature season, the underground temperature decreases with depth linearly, while it increases with depth during the low-temperature season.And the straight line type can be the temperature and depth of subgrade mathematical model in this area.

关 键 词:道路工程 温度 时间 路基深度 耦合仿真 

分 类 号:U416.21[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象