机构地区:[1]中国人民武装警察部队水电第一总队,南宁530222 [2]中国水利水电建设工程咨询中南公司,长沙410014
出 处:《广西水利水电》2012年第4期39-41,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:观音岩水电站右岸混凝土坝段坝基地质条件复杂,为了验证固结灌浆设计参数的合理性、探索合适的施工工艺,先后实施了两次生产性试验,按照第一次试验成果实施后,盖重混凝土出现了裂缝,为了防止混凝土裂缝的发生,保证灌浆质量,在总结第一次试验成果的基础上,进行了第二次试验。重点介绍第二次灌浆试验的施工工艺及试验成果。The concrete dam segment by the right bank of Guanyinyan Hydropower Station falls on a location with complicated geological conditions. In order to verify the designed consolidation grouting indexes are rational, seek proper construction technique, twice productive tests were conducted. Cracks were seen at the weighted concrete after the first test. The second test were conducted based on a summary of the last test in order to prevent crack and ensure grouting quality. Emphasis of introduction was put on the construction technique of the second test and analysis of testing results.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.124