风电场接入系统设计研究  

Research of Designing the Wind Farms Connected to the Power Grid

在线阅读下载全文

作  者:陈丽萍[1] 孙景强[1] 余欣梅[1] 钟杰峰[1] 陈志刚[1] 

机构地区:[1]广东省电力设计研究院,广东广州510663

出  处:《发电与空调》2012年第4期37-39,33,共4页

摘  要:广东大规模风力发电场的建设已经日益兴起,风电事业正逐步向产业化、规模化迈进,目前省内风电场多采用就近接入的原则。本文结合实际工程,对风电场接入系统方案进行较为系统性地论证,从技术、经济、风电场短路容量比等方面进行比较,最终推荐风电场接入系统的较优方案,力求为今后风电场接入系统设计提供参考。The construction of large scale wind farms is in progress in Guangdong. The wind farms is striding forward industrialization and standardization. Most of the wind farms are connected into the power grid nearby in Guangdong power grid nowadays. This paper demonstrates the methods of the wind farm connected to the power grid combining the actual pro- ject adequately. Through comparing the technology, the investment and the short circuit capacity ratio of the wind farm of different connecting methods, it recommends the best one. This paper is aimed at providing some reference for the design of the wind farms connected to the power grid.

关 键 词:风电场 接入系统 风电场短路容量比 

分 类 号:TM614[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象