郑州电网2012年迎峰度夏需求侧管理措施  

DSM measures to deal with the peak load during summer in 2012 of Zhengzhou power grid

在线阅读下载全文

作  者:郭勇[1] 张巍[1] 

机构地区:[1]郑州供电公司,郑州450007

出  处:《电力需求侧管理》2012年第5期36-38,共3页Power Demand Side Management

摘  要:2012年迎峰度夏期间,郑州电网负荷屡创历史新高,由于郑州市区一些规划新建变电站投运滞后,市区电网负荷红橙黄重载区域未得到有效缓解,迎峰度夏高峰时段,局部地区仍出现主变、配线过载现象。郑州供电公司按照河南省电力公司统一部署,加强电力需求侧管理,合理安排用户错避峰,在夏季高峰负荷电力供应不足的情况下,最大限度地满足电力客户平稳有序用电。Zhengzhou power grid load repeated a record high, during summer peak period in 2012. Because of lag planning new substations operation in the urban area of Zhengzhou, urban power grid heavy load did not get alleviating effectively in red orange yel-low area, the summer peak period, overload still appeared in local area in main transformer or in distribution line. Zhengzhou power supply company of Henan province in accordance with company unifies deployment, enhances power DSM, reasonable arranges for the user peak load shifting and averting, maximizes meet customer orderly electricity on the electricity supply shortage situation in the summer peak load.

关 键 词:2012年 郑州电网 迎峰度夏 电力需求侧管理 

分 类 号:TM714[电气工程—电力系统及自动化] F407.61[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象