检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁清泉[1] 汤涛[1] 李政民[1] 王恩来[1] 彭源[2]
机构地区:[1]国核电力规划设计研究院,北京市100095 [2]国核电力规划设计研究院重庆有限公司,重庆市401121
出 处:《电力建设》2012年第10期34-37,共4页Electric Power Construction
摘 要:短桩与锚杆组合应用的复合型杆塔基础是一种应用于上覆浅土层岩石地基的新型杆塔基础。以某500kV输电线路工程为背景,开展了新型基础设计,并应用FLAC3D有限元程序对该型基础的6种模型进行数值模拟。结果表明:短柱与锚杆组合应用的复合型基础可以满足输电线路杆塔基础荷载的要求,短柱底部施加锚杆可以显著提高基础的抗拔承载性能,但对抗倾覆性能的提高较小,此时可以通过增大立柱直径与增加基础埋深来提高高露头复合型基础的抗倾覆能力。The compound foundaiton with short pile and anchor is a new type tower foundaiton that is applied in the rock foundation covered shallow soil layer. Based on a 500 kV transmission linge project, the new type foundaiton was designed, and 6 kinds of numerical simulation model were studied with FLAC3D finite clement program for this foundation. The results show that the compound foundaiton with short pile and anchor can meet the load requirements of transmission line tower foundation, the short pier using anchor at bottom can significantly improve the foundation' s uplift bearing capacity, but the improvement of anti-overturning capacity in not obvious. In view of this situation, it can improve the anti-overturning capacity of compound foundation by enlarging the upright diameter and increasing the buried depth depth that is much more effective.
分 类 号:TM75[电气工程—电力系统及自动化] TU470[建筑科学—结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222