名山桥建桥河流壅水防洪影响研究  被引量:5

Research of River Damming on Flood Control

在线阅读下载全文

作  者:李东风[1] 张红武[2] 谢华伟[1] 欧剑[1] 陶爱强 张继原 

机构地区:[1]浙江水利水电专科学校,浙江杭州310018 [2]清华大学水利工程系,北京100084 [3]缙云县水利局,321400

出  处:《浙江水利水电专科学校学报》2012年第3期9-11,共3页Journal of Zhejiang Water Conservancy and Hydropower College

基  金:国家自然科学基金(51039003);浙江省自然科学基金(M503254);浙江省教育厅科技计划项目(Z200909405);浙江省水利科技计划项目(RC11092011)

摘  要:以拟建的缙云好溪名山桥为例,利用验证的船埠头大桥河流数学模型,对大桥建设后对河道防洪的影响和局部冲刷进行了技术分析,根据计算条件得到20年一遇洪水最大壅水高度为0.18m,壅水最大影响向上游在240m,对建桥引起的水位壅高和防洪能力降低,宜采取堤防加高加固方法,以满足防洪规划的要求.Taking the proposed Mingshan Bridge in Iinyun for example, the verified mathematics model of Wharf Bridge is used to analyze the influence of bridge construction on flood control. The value of river damming is estimated according to the calculation, with the maximum backwater height of 0.18 m and the biggest influence upstream of 240 m in 20 years. The strengthening methods to prevent flood, such as embankment heightening, are talked about in order to promote channel capacity to meet the requirements of flood control planning.

关 键 词:名山桥 河流壅水 防洪影响 二维河流数学模型 

分 类 号:TV214[水利工程—水文学及水资源]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象