检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:颜全胜[1] 骆宁安[2] 韩大建[2] 王卫锋[1]
机构地区:[1]华南理工大学交通学院,广东广州510640 [2]华南理工大学建筑学院
出 处:《华南理工大学学报(自然科学版)》2000年第6期64-68,共5页Journal of South China University of Technology(Natural Science Edition)
基 金:广东省自然科学基金资助项目! (9840 35 )
摘 要:考虑施工过程中结构体系不断变化、荷载逐步增加以及拱桥结构大位移等因素 ,建立了大跨度拱桥结构的非线性稳定计算模型 ,编制了相应的程序 .文中对某拱桥施工全过程的稳定性和几何非线性进行了模拟计算 ,得出了各个施工阶段稳定安全和非线性影响系数 ;In view of the effects of structural system change as well as the ever increasing loads during erection phases, an approach to the stability analysis of the arch bridge is presented. A program is developed and it can predict the nonlinear buckling of the arch bridge. The elastic lateral stability and the geometric nonlinear influential factors of a long span arch bridge during the construction phases are analyzed. Such analyses have provided the theoretical basis for the construction of the long span arch bridge.
分 类 号:U448.22[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222