石城子二级电站引水系统优化设计研究  被引量:3

The study for the optimization design in Shicheng second sub-power station diversion system

在线阅读下载全文

作  者:曾冬梅 栗帅[2] 

机构地区:[1]新疆水利厅农牧区水利规划总站,乌鲁木齐830000 [2]四川大学水力学与山区河流开发保护国家重点实验室,成都610065

出  处:《吉林水利》2012年第10期19-21,共3页Jilin Water Resources

摘  要:石城子二级电站为山区引水式电站,引水系统线路长,地形、地质情况复杂,本文经过充分论证,对引水系统的选线、形式、引水建筑物布置及结构形式进行了优化设计,推荐方案取消了渡槽等跨沟建筑物,降低了施工难度,节省了投资,缩短了施工工期,同时又增加了电量,取得了良好的社会效益和经济效益。Shicheng second sub-power station is a mountain diversion power plant,which has the long lines of the water diversion system,complex terrain and geological conditions.This article,after full argument,has carried out optimization design for line selection of the diversion system,form of diversion buildings layout and structures;The recommended plan had canceled the across ditch buildings such as aqueduct,which reduced the difficulty of construction,saving investment,shorten the construction period,while increasing the power,and achieved good social and economic benefits.

关 键 词:引水系统 工程布置 方案设计及优化 

分 类 号:TV732[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象