检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南交通大学土木工程学院,四川成都610031
出 处:《西南交通大学学报》2012年第5期741-747,共7页Journal of Southwest Jiaotong University
基 金:国家自然科学基金资助项目(50908192)
摘 要:为探讨大跨度混合梁斜拉桥施工过程中结构非线性稳定性的变化规律及其影响因素,以鄂东长江大桥为研究对象,按照结构型式及施工工序的特点,采用LSB和ANSYS有限元软件计算大桥施工过程非线性稳定安全系数并获得结构失稳形态,分析了非线性因素对静力稳定性的影响规律.此外,探讨了混合梁斜拉桥设计与施工工程参数——钢混结合部位置、索梁锚固方式、施工临时荷载及横向风荷载与大桥施工过程非线性稳定性的关系.结果表明,上述工程参数对施工过程非线性稳定性有不同程度的影响,但总体上并非其控制性因素.In order to research the change law of non-linear stability and its influencing factors of a long-span composite cable-stayed bridge during construction,by taking Edong Yangtze River bridge as research subject,LSB and ANSYS models were built based on the structure type and construction sequence of the bridge to calculate the non-linear stability safety factors during bridge construction and obtain the instability mode.The influencing law of non-linear factors to static stability was analyzed.In addition,the relationships among the stability during construction and steel-concrete connection position,cable-beam anchorage mode,temporary construction loads and cross-wind load were investigated.The research results show that the above factors have different effects on the stability during construction,but they are not controlling factors.
关 键 词:鄂东长江大桥 施工过程 非线性稳定安全系数 失稳模式 工程参数
分 类 号:U445.47[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249