检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长沙理工大学土木与建筑学院,湖南长沙410004
出 处:《长沙理工大学学报(自然科学版)》2012年第3期24-29,共6页Journal of Changsha University of Science and Technology:Natural Science
基 金:国家自然科学基金资助项目(51178059;51108046)
摘 要:以东路高架桥边跨合龙段施工工程为背景,采用平面杆系程序对边跨合龙方案由落地支架施工更改为吊架施工的桥梁结构进行了对比分析.研究结果表明,采用不同的边跨合龙方案对主梁在施工阶段、成桥阶段的受力状态影响较小.并对当过渡墩较高或支架需搭设在水中时,采用吊架施工的可行性进行了探讨.Based on side span closure construction of Donglu Viaduct Bridge as project background,this paper comparatively analyzed the bridge structure whose side span closure scheme has been changed from consol supports to hanger.Results showed that mechanical behaviors of main girder rarely changes in the construction stage and the orperation stage.The construction feasibility has been discussed in the circumstances that transition pier is high or consol supports must be erected in water.
关 键 词:刚构-连续组合体系 边跨合龙方案 应力比较 线形比较
分 类 号:U448.216[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31