万家寨引黄入晋工程总干线一级泵站运行监测成果分析  

Operation Monitoring Data Analysis of No.1 Pumping Station in General Main Line of Wanjiazhai Yellow River Diversion Project

在线阅读下载全文

作  者:刘培锋 

机构地区:[1]山西省万家寨引黄工程总公司,山西省太原市030012

出  处:《水电自动化与大坝监测》2012年第4期68-71,共4页HYDROPOWER AUTOMATION AND DAM MONITORING

摘  要:对山西省万家寨引黄入晋工程总干线一级泵站运行期的监测资料进行全面分析。通过分析建筑物各部位监测项目资料在运行期间通水、放空过程的变化,对总干线一级泵站在运行期间的稳定性和工作状态做出评价,并根据监测成果,对今后工程的运行管理提出建议和意见。A comprehensive analysis of monitoring data during operation period in No. 1 pumping station in general main line of wanjiazhai yellow river diversion project is given in this paper. Through contrasting the monitoring data change of each structure part while water filling, emptying operation, the stability and work state of No. 1 pumping station are evaluated. Based on monitoring result, suggestions and opinions are made for the project operation and management in the future.

关 键 词:泵站 调压井 出水岔管 应力集中 内水外渗 

分 类 号:TV672.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象