从北京地铁亦庄线运营实践谈如何提高地铁设计质量  

Comments on Improving Metro Design Quality from the Operation Practice of Beijing Metro Yizhuang Line

在线阅读下载全文

作  者:郭建平[1] 

机构地区:[1]北京市市政工程设计研究总院,北京100082

出  处:《都市快轨交通》2012年第4期38-42,共5页Urban Rapid Rail Transit

摘  要:对北京地铁亦庄线(2010年12月底开始试运营)试运营期间的运营状况进行追踪分析,对试运营中反映出的问题进行反思,从两线衔接、预留线位、设计习惯做法、运营需求、设计专业配合等方面分析地铁建设在设计阶段应注意的问题,对如何提高新建地铁项目的设计质量及服务水平提出建议。Beijing metro Yizhuang line entered into trial operation at the end of December 2010.General designer made tracing analysis on the operation situation of Yizhuang line during the trial operation.Rethinking the problems during the operation of Yizhuang line,the author summarized the problems that should be paid attention to at the planning and design stages in metro construction in terms of connection of two lines,reserved line position,design routine practices,operational demands and design coordination and so on.Proposals are put forward to improve the design quality and service level of new projects.

关 键 词:北京地铁亦庄线:两线衔接 预留线位 运营需求 地铁建设 规划设计 

分 类 号:U231[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象