检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张锋春[1] 沙城满[1] 梁力[1] 祝顺义[1] 申俊庭[1] 黄微[2]
机构地区:[1]东北大学,沈阳110004 [2]辽宁省电力有限公司,沈阳110000
出 处:《现代隧道技术》2012年第5期73-78,共6页Modern Tunnelling Technology
基 金:沈阳市科学计划项目(F10-148-9-00)
摘 要:中洞法是地铁车站施工中常用的施工方法,可以有效地提高开挖期间围岩的稳定性。拟建车站旁侧既有建筑可引起车站开挖导致的原场地应力不均衡,对支护结构内力形成不良影响。文章通过对某旁侧有建筑物的拟建车站中洞法施工进行了有限元数值模拟,计算分析了既有建筑对车站支护结构受力的影响,以及车站支护结构的内力特点与变化规律。结果表明,既有建筑会引起车站开挖过程中支护结构的受力偏转,进而引起局部不均匀沉降。The center drift method is commonly used in the construction of subway stations because it effectively improves the stability of surrounding rock during excavation. The existence of buildings near a proposed station could cause an imbalance of in-situ stress around the excavation area, which could have an adverse effect on the supporting structure. Using FEM analysis on center drift construction, the bending moment of the support structure in every step of excavation was calculated, the effects of the existing building on the support structure were determined, and the characteristics and variation pattern of the internal force of the support structure are summarized. The results show that the existing building will cause force deflection of the supporting structure during the station excavation and further result in partial differential settlement.
关 键 词:既有建筑 地铁车站 中洞法 结构内力 有限元数值模拟
分 类 号:U231.4[交通运输工程—道路与铁道工程] U451.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.24