检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003 [2]华南理工大学土木工程与交通学院,广东广州510641
出 处:《资源环境与工程》2012年第5期448-450,共3页Resources Environment & Engineering
摘 要:拟建48座桥梁位于金堤河干流,是金堤河二期治理工程主要工程项目。饱和砂土震动液化是各桥基土主要工程地质问题之一,笔者根据各桥基土工程地质条件,分析研究场地的宏观液化势,用标贯、静探和动三轴试验方法进行地基土液化可能性判别,并对各桥基土进行液化危险性等级划分。The forty-eight bridges which will be built in main stream of Jindi River,is the major engineering projects of second stage regulation project of Jindi River.Seismic liquefaction of saturated sand is the major engineering geological problem of each bridge foundation soil.Based on engineering geological condition of each bridge foundation soil,the macro liquefaction potential analysis of site is performed,the liquefaction possibility of foundation soil is discriminated by using standard penetration,cone penetration test and dynamic triaxial test,the liquefaction risk grade of each bridge foundation soil is divided.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.88.233